Kimbolton case study
Woodchip in hand

GG Eco Solutions are supplying low carbon energy to Kimbolton School in Cambridgeshire, under a long term contract.

The energy
 is supplied to several buildings at the Kimbolton School site from a newly installed biomass energy system and district heating
 network, designed, installed and funded by GG Eco Solutions.

Fuel supply:
The biomass fuel for the project is sourced from local sustainably 
managed woodlands.

Carbon emissions savings:

Over 200 tonnes of CO2 equivalent saved per year of operation
 [Calculation using SAP 2009 emissions factors]

Energy supply start date:
November 2013

Energy supply contract term:
15 years.

 

Contact us now to arrange a free, no-obligation site assessment.